Mount Saint Joseph Academy Infrastructure Improvements

Location

120 W. Wissahickon Ave.

Flourtown, PA 19031

Completion

Summer 2023

Market

Education

Scope

Infrastructure Improvements

 

 

Partners

Mount Saint Joseph Academy

Carter M. Young

McGillin Architecture, Inc.

Brandon

Building Systems Engineering

Corsi Associates

 

Summer 2019 – Fontbonne Room, School Store Renovation, and President’s Office Renovation

Renovation of the school store, Fontbonne Room (informal student recreational and gathering space) and president’s office. This project included layout changes, all new finishes and fixtures, and significant upgrades to existing mechanical systems.

Summer 2020 – Kitchen and Dining Area Renovation and Restroom Renovations

Installation of all new fixtures, finishes, and major upgrades to mechanical systems in school dining hall in conjunction with complete demo and installation of redesigned commercial kitchen.  Simultaneous renovation of two restrooms in gymnasium corridor (used primarily for events), including complete demo, layout change, and all new fixtures and finishes.

Summer 2021 – Mount Restrooms Renovation

Renovation of cafeteria and academic corridor restrooms on first and second floor, including complete demo, asbestos remediation, layout change, and all new fixtures and finishes.

Summer 2022 – Mount Café Courtyard Project

Exterior renovation to create new exterior courtyard space, including demo and removal of existing concrete and steel structures, installation of concrete and stone walkways, custom built steel and wood benches, wooden slat fencing with green-wall sections for climbing plants, and new landscaping.  Work also includes installation of landscape irrigation systems, low voltage pathway lighting, and exterior power and USB charging outlets.

Summer 2013 – Mount Science Wing

The 27,000 SF renovation provided new science laboratories and classrooms within the existing two story science wing. The existing classroom spaces were completely demolished, new ceiling systems, lighting, and new laboratory workstations were provided throughout. Additionally, a new four pipe chiller system with unit ventilators was installed throughout the wing, providing new air conditions to the wing and replacing the outdated boiler heat system. The project was completed over a 10 week period during summer recess, and the required start of school completion date was successfully achieved.

Excellence in Every Endeavor

  • 7

    Summer renovations completed