800 E. Lancaster Ave.
Villanova, PA 19085
2021 to today
Education
18 projects within over 27 buildings on campus
Blackney Hayes Architects
D2 Groups
Meyer Design Inc.
P-Squared Engineering
AEC Engineers
MG Architects
Entech Engineers
Included upgrading room finishes, lighting fixtures, and bathroom finishes and fixtures for the student lounges within four dorm buildings. Each lounge is approximately 900 SF. These buildings included St Monica Hall, St Katherine Hall, Caughlin Hall, and McGuire Hall.
Included converting the open foyers of four dorm buildings into student lounges, and renovation of the vestibules for each building. Each renovation is approximately 1,225 SF. The project included upgrading the finishes, lighting fixtures, constructing demising walls and vending machine alcoves, and custom wood capping for the 2nd and 3rd floor railings and beams. These buildings included Welsh Hall, Rudolph Hall, Moulden Hall, and Klekotka Hall.
Three floor, 3,950 SF of lounge and student common area spaces renovations. This project included upgrading finishes and light fixtures.
3,320 SF of hallway renovations and upgrades. This project included replacement of all doors and hardware, upgrading wall finishes, and relocating cash card machines to create a new lounge area for students.
3,800 SF renovation the Men’s, Women’s, and two coach’s locker rooms at Farley Hall. This project included upgrading the bathroom and shower finishes and fixtures, upgraded locker room finishes, new lockers with integrated electrical outlets, upgrading back-of-the-house facilities to include the laundry room and equipment room, a new Training Room with state-of-the-art soaking tubs, and upgrading the existing mechanical systems. In addition to the locker room renovations, this project included a renovation of the 1,800 SF conference room, team lounge and break room with kitchenette with new finishes, baffle ceilings, and custom millwork.
10,000 SF renovation and conversion of the old St. Mary’s Chapel into a new bookstore. This project included removal of the existing alter and pews, replacing with 2,250 SF of concrete floor infills. New upgraded finishes, refurbishing/cleaning of existing stained-glass windows, and upgrades to the existing mechanical systems. Exterior work for this project included providing a new ADA ramp at the rear entrance, new parking with additional site lighting and new sidewalks leading up to the main entrance.
Project located within Villanova Stadium included upgrading the Men’s and Women’s Lacrosse locker rooms, including new finishes, renovated team areas, and providing custom lockers with integrated power features.