Summer 2019 – Fontbonne Room, School Store Renovation, and President’s Office Renovation: Renovation of the school store, Fontbonne Room (informal student recreational and gathering space) and president’s office. This project included layout changes, all new finishes and fixtures, and significant upgrades to existing mechanical systems.
Summer 2020 – Kitchen and Dining Area Renovation and Restroom Renovations: Installation of all new fixtures, finishes, and major upgrades to mechanical systems in school dining hall in conjunction with complete demo and installation of redesigned commercial kitchen. Simultaneous renovation of two restrooms in gymnasium corridor (used primarily for events), including complete demo, layout change, and all new fixtures and finishes.
Summer 2021 – Mount Restrooms Renovation. Renovation of cafeteria and academic corridor restrooms on first and second floor, including complete demo, asbestos remediation, layout change, and all new fixtures and finishes.
Summer 2022 – Mount Café Courtyard Project. Exterior renovation to create new exterior courtyard space, including demo and removal of existing concrete and steel structures, installation of concrete and stone walkways, custom built steel and wood benches, wooden slat fencing with green-wall sections for climbing plants, and new landscaping. Work also includes installation of landscape irrigation systems, low voltage pathway lighting, and exterior power and USB charging outlets.